Nine kilometers of pipe conveyor to the sea
Amuay's coke handling system (the Lagoven CRAY project) moves 1,100 t/h of petroleum coke from the pits to the Punta Adaro yard and the dock shiploader. Two pipe conveyors of about 9 km each do it dust-free. Running since 1982, with FAM (BEUMER Group) as technological heir of Robins and PWH, and RELANSA as local channel.
9 km
OF PIPE CONVEYOR
TECHNOLOGY BY
FAM (BEUMER Group)
Oil, Gas & Refining
01
THE CHALLENGE
Carry coke along the Adaro peninsula — in the open, by the sea — without spills or dust, and load bulk carriers at a rate of about 100,000 t a month.
02
THE SOLUTION
P&H yard crane; toothed-roll crusher car of 800–1,500 t/h; 30" belt to the first transfer; ø 11.8" pipe conveyor of ~9,000 m to the yard; 350–400 t/h traveling stacker; VP 1-1100/42 portal reclaimer of 1,100 t/h; 54" belts and a second ø 19.7" pipe conveyor of ~9,000 m to the 1,000–1,100 t/h shiploader.
03
THE IMPACT
Over four decades in service and a dispatch record of about 100,000 t a month through the shiploader. RELANSA manages with FAM BEUMER the spares engineering and modernization of Paraguaná's installed coke base.
// TECHNOLOGY BY
FAM (BEUMER Group)
VIEW PARTNER →Integral bulk material handling systems: stackers, reclaimers, conveyors, pipe conveyors and shiploaders. FAM is also the technological heir and custodian of thyssenkrupp Fördertechnik, Robins and PWH, the equipment that moves Venezuela's bauxite, ore, fertilizers and coke. RELANSA is FAM BEUMER's office in the country, in Caracas and Puerto Ordaz.
// GALLERY
6 PHOTOS // ACTUAL PROJECT PHOTO