// PROJECTS
REL-04
References that carry weight.
23 case studies, 35 references, four decades, millions of tons. Every project with its technical data — because in this industry, data is reputation.
// REFERENCE LIST
Factory technology, local execution.
The Venezuelan plants where RELANSA has supplied, installed or supported its partners' technology, grouped by technology provider and, within each, by sector or product family. Rows with an arrow have a full case study.
thyssenkrupp Polysius
Germany // 7 REFERENCES
- SIDOR — Planta de CalMatanzas Industrial Zone, Puerto Ordaz, BolívarComplete calcined lime plant, lines A and B, 1,800 t/d: design, manufacture, supply and commissioning1990→
- Vencemos Pertigalete (CSC)Guanta, AnzoáteguiCement lines 6 and 7, 2 × 1 Mt/y, 1,000 tph shiploaders; continuous support: DIAPOL, POLYTRACK®, hot alignment1997 →→
- Cemento Cerro Azul, C.A. (CSC)El Pinto, Maturín, MonagasComplete new plant (greenfield), 1,000,000 t/y gray Portland cement2003→
- SIDOR — Planta de CalMatanzas Industrial Zone, Puerto Ordaz, BolívarComprehensive Line B audit (900 t/d) and POLSCAN® service2006–2007→
- Cemento Andino (CSC)Llanadas de Monay, TrujilloSpecialized technical service and plant audit, hot POLSCAN®, 600,000 t/y2014→
- Corporación Socialista del CementoCSC plants (formerly Cemex, Holcim and Lafarge)Critical spares and POLSCAN® kiln geometry inspection—
- Industria metalúrgicaCiudad Guayana, Bolívar, and Loma de Níquel, AraguaPyroprocessing and grinding equipment for iron ore and nickel—
FAM (BEUMER Group)
Germany // 13 REFERENCES
// MINING
- CVG Ferrominera OrinocoPellet Plant 1, Puerto Ordaz, BolívarOre and product yard: stacker, bridge reclaimer with two bucket wheels, traveling pellet stacker and conveyors—→
- CVG BauxilumMatanzas, Puerto Ordaz, BolívarBauxite yard: stacker, bucket-wheel stacker-reclaimer, indoor and outdoor portal reclaimers, conveyors; scraper reclaimer rehabilitation2012→
// FERTILIZERS
- Fertinitro / Fertilizantes de OrienteJosé Complex, Anzoátegui130,000 t urea stockyard, KP1000.56 portal reclaimer, TC800 tripper car and 1,000 t/h shiploader1999–2001→
- PequivenMorón Complex, Carabobo60,000 t urea stockyard: KP220.49 portal scraper, TC650 tripper car, 220 t/h2008→
- PequivenLa Catedral, Morón Complex, Carabobo2 × 28,000 t NPK/DAP stockyard: two KH400.31 semi-portal scrapers, two TC200 tripper cars, 400 t/h2009→
- PequivenRocas Fosfáticas, Morón Complex, CaraboboPhosphate rock stockyard (16,000 t + 9,200 t): KS120.15 side scraper, KB200.22 bridge reclaimer, ST700.20 and ST120.18 stackers, 700/120 t/h2009→
- PequivenMorón Complex, CaraboboTUL7.150 truck unloading station with hopper and conveyor, 50–180 t/h (phosphate sand, potash)2013→
- PequivenMorón Complex, Carabobo4 × 6,200 t stockyard: two KT150.12RT slewing scrapers, 150 t/h (urea, NPK, DAP)2016→
// REFINING: COKE & SULFUR
- PDVSA — Centro de Refinación ParaguanáAmuay Refinery, Punto Fijo, Falcón1,100 t/h coke handling system: two ~9 km pipe conveyors, stacker, portal reclaimer and shiploader1982→
- PDVSA — Centro de Refinación ParaguanáCardón Refinery, Punta Cardón, Falcón1,000 t/h coke handling system: overhead cranes, crusher car, reclaimer, stacker and shiploader; radial loader maintenance; 2026 technical visit1996→
- PetrocedeñoJosé Complex, AnzoáteguiRestoration of radial mobility on the double-orbital-slewing coke and sulfur loading system—
- PetroSanFélixJosé Complex, AnzoáteguiComplete rehabilitation of the coke and sulfur handling plant; 200 t/h sulfur shiploader with 27.2 m boom—
- Petroraima (Petrozuata)José Complex, AnzoáteguiComplete rehabilitation of the coke and sulfur handling plant—
Voith Turbo / Voith BHS
Germany // 8 REFERENCES
// TORQUE CONVERTERS FOR GAS TURBINE STARTING
- CORPOELECThermal plants in the Center-North, Andes, West and EastOver 25 EL 9 YGTM 4.0-86 torque converters (up to 4,000 kW) in gas turbine starting packages; on-site inspections—→
- PDVSAPower generation system, Puerto La Cruz, AnzoáteguiTwo EL 9 YGTM 4.0-86 torque converters (4,000 kW, 3,600 rpm) in generating-turbine starting packages: design, manufacture, supply and commissioning2005
// VARIABLE-FILL HYDRODYNAMIC COUPLINGS
- CORPOELECThermal plants in the Center-North regionOver 21 R17 K 550 variable-fill hydrodynamic couplings (6,800 kW) on boiler feedwater pumps; on-site inspections—→
- PDVSAGas compression plant, MonagasVoith R 18 KGS-14 (API) turbo couplings—
// SVTL VARIABLE-SPEED COUPLINGS
- CVG BauxilumMatanzas, Puerto Ordaz, BolívarOver 30 SVTL variable-speed couplings (30–410 kW) on Bayer-process slurry pumps—
// TECHNICAL SERVICES & AUDITS
// CONSTANT-FILL HYDRODYNAMIC COUPLINGS
- Petrocedeño (ex Sincor)—TVV 422 constant-fill hydrodynamic coupling with delay chamber, for soft starting and drivetrain protection—
// HIGH-POWER GEAR UNITS
- Supermetanol—Voith BHS TGD20 speed-increasing gearbox—
Metal 7
Canada // 2 REFERENCES
Uhde High Pressure Technologies
Germany · Hagen · thyssenkrupp group // 2 REFERENCES
- Pequiven MorónMorón, CaraboboHigh-pressure valves for ammonia synthesis (>300 bar)2013→
- PolinterAna María Campos Petrochemical Complex (formerly El Tablazo), Miranda municipality, ZuliaInitiator injection pumps up to 3,600 bar, let-down and safety valves and high-pressure piping for the low-density polyethylene plant (tubular reactor)—→
thyssenkrupp Uhde
Germany // 1 REFERENCE
Linde Engineering / Selas-Linde
Germany // 1 REFERENCE






















